Friday, March 4, 2011

Porch, gyprock and insulation


The roof of the porch was removed. New beams will be installed, lining boards to be added and a colorbond roof.
















Gyprocking (sheeting) of the walk-in-robe (WIR).






















Installation of insulation in the wall between the WIR and ensuite.

No comments:

Post a Comment