The roof of the porch was removed. New beams will be installed, lining boards to be added and a colorbond roof.
Gyprocking (sheeting) of the walk-in-robe (WIR).
Installation of insulation in the wall between the WIR and ensuite.
This is our blog about the extension to our home in Sydney
No comments:
Post a Comment