Wednesday, March 30, 2011

Bath & Render


The bath was installed in the main bathroom today.

















A second coat of render was put on some of the surfaces in the new extension.
















Another surface in the extension. The hose popping out is for the natural gas (to a BBQ if we want out on the deck (yet to be built)).

Monday, March 28, 2011

More plastering


Hard set plaster in the master bedroom.


















Hard set plaster in the hallway.
























Hard set plaster in bedroom 3.

Wednesday, March 23, 2011

Roof on Porch


There is now a roof on the front porch. A colorbond metal roof in "Manor Red" will be put on it.















A view of the lining boards for the front porch. They are yet to be painted.

Tuesday, March 22, 2011

Porch construction


The front porch is being constructed.




















Detail on the front porch.




















Cornices in the hallway.

Thursday, March 17, 2011

Exterior painting, trusses and cornices


Trusses have arrived for the roof of the new extension.

















The first coat of "Self Destruct".






















Cornices "crown mouldings" installed in one of the girl's bedrooms. Obviously a work in progress!



















Work on the southern wall of the old part of the house and the new extension.













Saturday, March 12, 2011

More painting and gyprocking


More undercoat was done on the exterior of the house.





















Also gyprocking of the ceiling in the hallway and the vaulted area was done.

Friday, March 11, 2011

Porch gone


The porch was removed today to be built another day soon.

Thursday, March 10, 2011

A whiter shade of pale


A white under coat was put on the northern brick wall today.

Tuesday, March 8, 2011

Ensuite gyprocking


More gyprocking of the ensuite was done.























Also the box framing for the extractor fan with heat lamps was started.

Monday, March 7, 2011

Bathrooms


Gyprocking of the ceiling in the main bathroom was done.























More insulation in the ensuite.

Sunday, March 6, 2011

Wall paint and main bathroom floor


We tested a colour (called Self Destruct) on the exterior wall.


















The installation of the main bathroom floor was started.

Friday, March 4, 2011

Porch, gyprock and insulation


The roof of the porch was removed. New beams will be installed, lining boards to be added and a colorbond roof.
















Gyprocking (sheeting) of the walk-in-robe (WIR).






















Installation of insulation in the wall between the WIR and ensuite.

Thursday, March 3, 2011

Water tight and start of ceilings


The old part of the house has a roof and is essentially watertight (except for rain coming in horizontally).
















Also the installation of ceilings has started in the old part of the house. This photo of the hallway looking towards the front door.























The ceiling in the master bedroom.

Wednesday, March 2, 2011

Roof nearly half complete


The roof for the old part of the house is nearly complete. Obviously gutters and downpipes need to be installed.















The front of the house from the other side of the property.

Tuesday, March 1, 2011

More roofing and plumbing


I had a meeting this morning on site so this photo is of the front gables being removed.

















Later in the day the front gables were gone and some of the carpentry replaced.
















Even more plumbing in the main bathroom.