Temporary stairs were placed from Bedroom 3 (old lounge area) into the loft.
An old air vent in Bedroom 3 was bricked in.
More brick work in the recess for the window in the ensuite to bring it up to the correct height.
The high wall on the southern side of the house went a bit too far east and now has to be cut back so the lower roof can fit.
No comments:
Post a Comment