Another day of carpentry and brick laying. Two brick columns to support the floor of the master bedroom ensuite.
Also the floor of the wet area of the ensuite was laid.
On the other side of the extension the
carpentry for the floor of the loft was started.
A view from underneath of the loft floor from what will be the kitchen area.
The main bathroom window was installed.
Plus some repair work on the northern wall of the old part of the house was undertaken.
WOW, things are happening fast and furious now. This is great to see.