More work was done today on plumbing the water tanks.
More action behind the tanks.
Tuesday, February 28, 2012
Friday, February 24, 2012
Water tanks installed
The water tanks were position in their final resting place today. This view looking west.
This view in the opposite direction. Note the top of the two tanks are at the same height. A thing of beauty.
As a result we have a lot more room in the front yard.
A prep coat on the sill bricks at the laundry
and the study windows.
This view in the opposite direction. Note the top of the two tanks are at the same height. A thing of beauty.
As a result we have a lot more room in the front yard.
A prep coat on the sill bricks at the laundry
and the study windows.
Thursday, February 23, 2012
Installation of windows
Today was the start of the installation of the high gable windows. In the walk-in-robe the old window was removed
and the new one installed.
The deck beam was also painted.
Some of the scaffolding on the southern side of the house was dismantled.
and the new one installed.
The deck beam was also painted.
Some of the scaffolding on the southern side of the house was dismantled.
Monday, February 20, 2012
Windows arrive
Yesterday a second coat was painted on the eaves and blue board at the eastern and northern sides of the extension.
Also the large deck post got two coats of "Ironstone Blue".
The most exciting event happened today with the arrival of the high gable windows. Hopefully they will be installed tomorrow but doubt it since the rain is back.
Also the large deck post got two coats of "Ironstone Blue".
The most exciting event happened today with the arrival of the high gable windows. Hopefully they will be installed tomorrow but doubt it since the rain is back.
Saturday, February 18, 2012
A big day of painting
Lots done today. Prep and first coat on the upper eaves on the eastern side of the extension.
Prep and first coat on the upper parts of the blue board at the eastern and northern walls of the extension. This view looking south from the scaffolding.
Prep and first coat on the upper parts of the blue board at the eastern and northern walls of the extension. This view looking south from the scaffolding.
Friday, February 17, 2012
Guess what? More painting
First coat on the sill bricks along the northern side of the house
and the southern side.
A second coat on the eastern and northern blue board of the extension.
and the southern side.
A second coat on the eastern and northern blue board of the extension.
Thursday, February 16, 2012
Plumber returns again
The plumber returned again today. He laid pipes for the storm water from the water tanks through the front yard. This photo for the last section out to the street.
Continuing under the path and then a turn to the right towards the house.
Finally up and over the retaining wall to the tanks.
Also did some painting. This shows the first coat on the fascia board in "Ironstone Blue".
First coat on the eastern and northern blue board of the extension.
A prep coat on the sill bricks along the northern side of the house and
the southern side.
Continuing under the path and then a turn to the right towards the house.
Finally up and over the retaining wall to the tanks.
Also did some painting. This shows the first coat on the fascia board in "Ironstone Blue".
First coat on the eastern and northern blue board of the extension.
A prep coat on the sill bricks along the northern side of the house and
the southern side.
Subscribe to:
Posts (Atom)