
Sorry for no updates for the last month. Unfortunately the builder found lots of things in the ground that had to be removed - septic tank, another concrete slab and a tree
stump with branches. To remove took time and money!
At this stage the trenches are done and the formworker
for the slab is a day away from finishing. We hope to have
the slab poured in the middle of next week.